2h time frame
-
RUNE is creating a potential cup and handle srtucture, also in the phase of continuation structure, which pumping wave is 0.905 ~ 2.028. Critical resistance is obvious at 1.973, if RUNE can break above it then we can have higher target based on the cup and handle structure.
TP: 2.493~2.665
SL: 1.414