HC_Haplo
Long

Tawana Resources - The Next Lithium Producer

ASX:TAW   TAWANA RESOURCES NL
Recent posts by the Director Of Development at Primero on Linkedin             have confirmed that $TAW is currently started commissioning and will likely be in production early March. $TAW is likely to be the next Australian Lithium producer.
Rare opportunity available to accumulate more at these levels after the recent sell off from the DOW correction.

Broker Targets
-----------------
Canaccord .60 - http://spcagent.co/tawana//wp-content/uploads/sites/37/2017/11/Canaccord-Research-Report-Initiation-of-Coverage.pdf


Highlights
---------------

Tribeca Investment Partners

Feasibility Study Key findings – “Starter Pit”1
IRR             of 185% and rapid payback period of 12 months.
EBITDA of $83m per annum, operating cashflow of $223m (after capital).
Forecast annual production approximately 155,000tpa of spodumene concentrate from the DMS and 260,000lbs pa of tantalum
pentoxide from the TPF.
Lowest capital cost lithium project in Australia of $42m (excluding pre-production operating costs).
Starter pit life of 3.6 years with further growth for the Project expected from infill and extensional drilling.
Approximately 86% of total lithium Indicated and Inferred Resources report to scoping pit optimization.
Detailed design well advanced             , long lead items ordered and key fabrication packages awarded under an early works contract.
Production scheduled for the March quarter 2018.

Lowest Capex in Australia
Contract mining
Contract crushing
Retrofit 1,200ktpa spodumene DMS circuit
Run separate tantalum plant at 350ktpa
Limited additional infrastructure required
Limited mining pre-strip required
Exceptional Metallurgy
Exceptional recoveries and product
Offtake finalised
US$880/t for 2018 and 2019
A$25m pre-payment (TAW 50%)
No interest
Paid from 20% of lithium sales

Production of 155,000t p.a. from March 2018 (increasing with the addition of fines circuit)
• Top quality +1mm spodumene concentrate
• Significant tantalum by-product production
• Lowest Capex (of stand alone mines)
• High Project Internal Rate of Return and rapid payback (1 year)
• Significant Resource             potential from successful step out drilling and new areas identified.
Resource             and Reserve update in October 2017
DE Deutsch
EN English
EN English (UK)
EN English (IN)
FR Français
ES Español
IT Italiano
PL Polski
SV Svenska
TR Türkçe
RU Русский
PT Português
ID Bahasa Indonesia
MS Bahasa Melayu
TH ภาษาไทย
VI Tiếng Việt
JA 日本語
KO 한국어
ZH 简体中文
ZH 繁體中文
AR العربية
HE עברית
Startseite Aktien-Screener Devisen-Screener Krypto-Screener Wirtschaftskalender So funktioniert es! Chartmerkmale Hausregeln Moderatoren Webseite & Brokerlösungen Widgets Stock Charting Bibliothek Feature-Anfrage Blog & Nachrichten FAQ - Häufige Fragen & Antworten Hilfe & Wiki Twitter
Profil Profileinstellungen Konto und Abrechnung Meine Support Tickets Support kontaktieren Veröffentlichte Ideen Followers Ich folge Private Nachrichten Chat Abmelden